Strategically located on the Port of Kingston, Kingston Wharves Limited is a terminal facility which operates 24 hours per day, 365 days per year. Its operations are supported with the following infrastructure and expandable fleet of equipment:
INFRASTRUCTURE
- Continuous Quay measuring 1,655 metres (5,430 feet)
- 9 Deepwater Berths for ro-ro, lo-lo, container, general break bulk and bulk cargoes
- Vessel Draft: 9 metres (29 feet) to 13 metres (42 feet)
- On-Dock Open Storage: Approximately 242,000 square meters or 2,605,000 square feet
- On-Dock Transshipment Car Park: 48,562 square metres or 522,720 square feet
- On-Dock Warehouse Storage: 21,225 square metres or 228,000 square feet
- Off-Dock Storage: 20,000 square metres or 215,000 square feet
- Reefer Plugs: 176 at 44 Volts
EQUIPMENT
- 1 Liebbher crane (September 2015)
- 4 Gottwald Mobile Harbour Cranes
- 14 Reach Stackers
- 1 Empty Container Loader
- 1 Toploader
- 15 Trucks/Bomb Carts
- 1 Terberg Tug Master